Heat dissipation and cooling of transformer room

Time:2020-5-30 15:33:49      Clicks:122

When transformer is used in distribution station, the heat dissipation and cooling of transformer is the primary concern of the staff. Generally speaking, there are two kinds of measures for cooling transformer: natural ventilation and unnatural access. Natural ventilation is completely dependent on natural forces, so that outdoor air into the indoor, and indoor air out of the outdoor. There are two primary forces of natural ventilation: ventilation 1 caused by the difference in air pressure caused by the difference in temperature and height between indoor and outdoor. Ventilation caused by different wind speeds inside and outside the room. Mechanical ventilation is the use of mechanical and electrical equipment such as exhaust fans, blowers to achieve ventilation.
In order to better solve the problem of transformer cooling, oil-immersed transformer manufacturers introduce the effective measures of transformer cooling:
1. In order to solve the heat dissipation problem of the main transformer in the whole indoor substation, the mechanical structure of the transformer is firstly solved. The separated setting of the transformer body and the radiator is adopted to increase the thermal radiation area of the transformer.
2, put the transformer low, the transformer is placed in the indoor lower temperature area, enhance the transformer heat dissipation effect.
3. Low loss transformer is adopted to reduce winding temperature rise.
4. Reasonable selection of ventilation window area. Each split transformer is equipped with 16 sets of radiators, which are individually arranged in one room. 2 ventilation shutters of 2.5m×1.5m are set at the lower part of each radiator room, and the upper part of the radiator room is not sealed, which not only does not affect the inspection of radiators by operators, but also ensures sufficient air inlet area in the radiator room and adopts natural ventilation. The transformer body room is equipped with ventilation shutter air inlet, with an area of about 15m2 and a height of 1.5m, which is convenient for operators to patrol. Among them, the roof is equipped with 2 ventilation shafts of 1.5m×1.5m×8.4m, which adopt the form of up-down direct wind. The chimney effect principle and optimized ventilation structure make it have a strong heat dissipation capacity.
5. In addition to the air inlet shutter and ventilation shaft, mechanical exhaust -- low-noise axial flow fan is added to jointly complete the ventilation task of the transformer body room, so that the exhaust fan can be put into operation when the transformer load is relatively full in summer.